Showing posts with label renovations. Show all posts
Showing posts with label renovations. Show all posts

Friday, February 13, 2015

It’s done, but Friday the 13th


Meant yet another glitch.

The bath renovations of the century are finally finished, but not without those last little
problems, one of which almost left us without the new shower for another 5 days.

Yesterday afternoon it was discovered that the plug inside the medicine cabinet for the shower room was too close to the shower (and water) itself. Fortunately the electrician was on the spot and was able to change the plug to the other side (do I want to know how much extra that is going to cost?). So at 6 p.m. it WAS DONE. And I was exhausted.

Then it was clean up the guest bedroom as the housemate and husband were returning the same night. They texted when they were 100 km out and we agreed to meet at one of our favorite restaurants. That was a great break – I requested a small beer the minute I sat down and was able to start relaxing.

Today passed in a whirlwind of activities, none of which made a dent in the paperwork that I should have been doing all week. Cleaning lady arrived and started making a dent in the built up dust and chaos from the renovations: I stripped the floors of their protective coverings and life started to improve (of course lunch up in another favorite restaurant where we were received with hugs and today a free drink didn’t hinder).

Until 10 minutes before six: in order to wash off the soap from the newly cleaned shower stall (we had needed to leave 24 hours for the caulking to dry) – no water. I had visions of
Leaving for 5 days with no shower available to younger son and housemate’s husband. But clever woman that she is – and I have a rather practical bent as well – we had discovered a small screw on the bottom of the fixtures. I called the plumber – who didn’t answer – so got out a screwdriver and was on the point of trying it when he returned my call.  They had forgotten to check that the water was on as they hadn’t wanted to wet the caulking, but at least he could confirm that all I needed to do was give that screw a quarter turn. Sure enough, saved.

I can now perhaps envision actually leaving the house in the care of S & R whilst D-L and I go enjoy other parts of Switzerland. Will I have the energy to blog? That’s less sure.

Bath with bathtub hidden to the right

Shower, toilet on the left just barely visible

Wednesday, January 21, 2015

I’m able to go to the bathroom again or ...


New toilet is functional.

For those who only read my blog and don’t know me in real life, it has been a bit of upset in the house as I completely renovate the shower and bathroom on my bedroom floor these past couple of weeks.

I, foolishly might I add, thought that it was well programmed (way back in November/beginning December) and that come Jan.5 everything would proceed apace and fall into place in two weeks.  Think again.

It was well programmed – all the players were in place and showed up first thing that Monday morning. At one point there were five men in between the two small rooms and I was taking a couple at a time down for coffee so that they wouldn’t get on each other’s nerves.

Well, the tiler finished his job yesterday – and a lovely one it was, well done down to the very littlest and last detail – the silicone joints. Today it was again the plumbers turn and although I have used this plumber before and will do so again, we had a spate of glitches: in starting the fixations on one element, bingo, a huge piece broke; then in drilling to put in place the glass fixture on the tub, they cracked a tile. Good news is that the tiler can return tomorrow to replace that.

We discussed where to put the shower poles in both bathrooms – no problems there. However then I found out that the sink, cupboard underneath said sink as well as the medicine cabinet in that bathroom had not yet been delivered (and last week supposedly everything was ready for pick-up… not the plumbers fault, but one would think that the appliance company would have kept us up-to-date in a more timely manner). The glass shower stall of course had to be first measured once the toilet and its encasings were finished. It is now on order but won’t be here for probably 10 days.

Such is life – sooner or later (betting on the latter) it will all happen and at least the toilet is functional on my floor and I will no longer have to take my flashlight to traipse up or down the stairs in the middle of the night.

Grateful for small favors!


Tuesday, January 6, 2015

Five men in a tub…


Oh, was it supposed to be only three? And probably out on a lake somewhere and not all in my shower and bathroom, I bet!

It has started: the renovation of the shower and bathroom on my floor.
As per schedule, the man who is taking down and putting up my tiles was waiting for me when I returned home from my morning coffee (and mail pickup). I thought we had agreed that they would all come at 8 a.m., but he remembered in between 7:30 and 8:00. No problem. He actually managed to start getting the protective plastic down (new fangled stuff that is slightly adherent so much easier to put down and stays in place also better) before the two men for the heating units showed up. They in turn were here when the plumber and his assistant showed up.  Five men (six if you add my youngest son who at least had the good sense to stay out of the way) in a space measuring only around 5m2 for the shower and perhaps 7m2 for the bath (with the bathtub still in place) is a wee bit much, but they all were very accommodating to each other’s job so it worked.

By giving the plumber and his assistant coffee first, we were able to let everyone do their job.

By noon I had served 8 coffees and not only were the pipes in place for the two radiators, but everything ceramic (except tub and shower base) was gone!  All the accouterments were taken down as well (and in the process a couple of items were re-cycled). The tiler came back at 13:15 and by 15:30 all of the tiles were off the walls of the bathroom.  Hard to imagine that it will take all of two weeks at that speed, but the old is gone so now it’s wait for the new. And I am consigned to the upstairs bath, the downstairs toilet and the cellar shower for the duration. Younger son, with my encouragement, is leaving for four days, which will help with the crowding.

I so do not envy my sister and her husband doing a total house rebuild! Two weeks will be enough for me, even if it’s the only way to have that many men in my house at one time.

Hallway in front of the shower and the bath rooms.

o.k. only 2 in this picture, but imagine 5!